project Specifics

Powering Gladstone’s Growth Through Water Security

The Yarwun Water Treatment Plant, first built in 1989, was no longer able to keep pace with the rapid industrial growth of the Gladstone region. To secure a reliable water supply for the Yarwun Industrial Area and Mt Larcom Township, the Gladstone Area Water Board initiated a major refurbishment and upgrade of the plant, boosting capacity from 3.6ML/day to 10ML/day.

This expansion was critical to ensure long-term water security for the fast-growing industrial hub.

About Yarwun Water Treatment Plant

The Gladstone Area Water Board owns and operates two water treatment plants, including the Yarwun Water Treatment Plant, which services the Yarwun Industrial Area and Mt Larcom Township. Originally constructed in 1989 with a capacity of 3.6ML/day, the plant faced increasing demand due to industrial growth in the region. To meet this demand, the Board initiated a refurbishment and upgrade project to increase capacity to 10ML/day.

The client required modernisation of plant systems to ensure reliable, automated operation of water treatment, backwash cycles, and clearwater pumping, alongside improved monitoring and control for sustainable long-term operations.

Deliverables

Services Provided:

  • Detail Design of new Main Switchboard and Control Panel
  • Detail Design of Communications and Control System
  • Detail Design of PLC and SCADA Systems
  • Detail Design of Instrumentation and Actuator Systems
  • Site Testing & Commissioning

Delivery Method:
Electrical Engineering Sub-Consultant

Outcome

The refurbishment of the Yarwun Water Treatment Plant successfully transformed its capacity and efficiency, ensuring the facility could meet the growing needs of the Gladstone region. By upgrading the plant’s capacity from 3.6ML/day to 10ML/day, the project secured a reliable water supply for both industrial and township demands.

The integration of a modern PLC and SCADA system provided the client with robust automation, improved monitoring, and greater operational control. These upgrades not only delivered immediate performance benefits but also positioned the plant for sustainable future growth, giving the Gladstone Area Water Board confidence in meeting long-term demand.